Adelaide median strip upgrade enhances safety and streetscape across 11.2km
Adelaide median strip upgrade enhances safety and streetscape across 11.2km

Roadside Services and Solutions (RSS) has successfully completed a major median strip upgrade and pedestrian fencing project along one of Adelaide’s busiest arterial roads, delivering significant safety, maintenance and beautification benefits for road users and the local community.
Contracted by Downer on behalf of the Department for Infrastructure and Transport (DIT), RSS was engaged to reinstate and refurbish 11.2km of median strip infrastructure along Brighton Road, stretching from Anzac Highway at Glenelg East to Scholefield Road at Seacliff Park.
Due to Brighton Road’s importance as a key transport corridor connecting Adelaide to the Fleurieu Peninsula, all works were undertaken at night to minimise disruption to motorists and the broader community.
A complex civil infrastructure upgrade
The project involved the refurbishment of 36 median strip islands located throughout the corridor.
Over many years, the growth and maturity of 75 established gum trees had resulted in significant damage to surrounding infrastructure. Expanding root systems and trunk growth had affected kerbing, asphalt, paving, infill materials and artificial turf treatments, while weather exposure and water ingress had further accelerated deterioration.
To restore the median strips, RSS delivered a comprehensive program of works including:
- Removal of damaged kerbing and asphalt
- Excavation of compromised infill and tree surround materials
- Replacement and compaction of quarry rubble infill
- Reinstatement of kerbing
- Asphalt profiling and resurfacing
- Re-haunching of paved areas
- Surface treatment delineation
- Mulching around established trees
- Planting of replacement trees along Holdfast Bay Council footpaths
The project also included specialist arboriculture services such as onsite assessments, root pruning and stump grinding to ensure the ongoing health of surrounding vegetation while protecting road infrastructure.
New pedestrian safety fencing installed
As part of the upgrade, RSS supplied and installed approximately 73 metres of new DIT-compliant pedestrian safety fencing at two locations within the Brighton precinct.
As South Australia’s distributor of Guard-R Street Guard RMS Pedestrian Fencing, RSS was able to provide a compliant and durable solution that improves pedestrian safety while meeting the latest government specifications.
Delivering results through teamwork
The project was led by RSS’s highly skilled Civil Works team.
RSS would also like to acknowledge the contribution of several specialist contractors who played an important role in the successful delivery of the project:
- Prime Traffic Solutions – Traffic management
- JJ’s Concreting & Construction – Kerbing
- Adelaide Arborist – Stump grinding and tree root pruning
- JVJ Civil & Asphalt – Asphalt works
- SA Composters – Mulch supply
- Southern Quarries – Quarry rubble supply
- QEST Infrastructure – Service location
- SMS Geotechnical – Compaction testing
Overcoming night works challenges
Running over a 15-week period, the project presented a number of logistical and operational challenges.
Working at night on a busy arterial roadway required careful planning and execution to ensure the safety of workers, motorists and pedestrians. The team also navigated weather delays, hold points and the coordination of specialist trades and suppliers outside normal operating hours.
Despite these challenges, the project was completed safely and successfully.
A safety success story
RSS CEO Craig Woods says, “One of the standout achievements of the project was the completion of the entire 15-week night works program without a single incident or near miss.
“Maintaining this safety record while operating in a high-risk environment is a testament to the professionalism, planning and commitment of everyone involved,” he said.
Delivering long-term benefits
The finished project provides significant benefits for multiple stakeholders.
For Downer and DIT, the works assist in meeting essential maintenance and risk mitigation obligations across the state road network.
For the City of Holdfast Bay and the local community, the upgrade delivers safer road infrastructure, reduced hazards and a more attractive streetscape along one of Adelaide’s most prominent coastal corridors.
“Most importantly, motorists, pedestrians and road users can now travel through the Brighton Road corridor with improved safety and confidence,” Craig Woods said.